Aspen will provide draw-downs in arrears of works in support of the project up to 100% of the cost of works.
This will either be done via a building surveyor or Aspen team member re-visit depending on level of works (or without a revisit based on build control or warranty sign-off) with turn arounds as fast as 48 hours.
We pride ourselves only supporting cases which we will see through to the end and are yet to leave a property unfinished.